We chose a pavement with a complex pattern – an antiqued rectangle 24x12, 12x12 and 12x6 cm with a rustic influence, adapted to a mountainous region as far as the shape and colors are concerned. We created a 700 square meter space for a small winter fair where tourists can spend their evenings in a picturesque environment.
We combined Penterr Piazza tiles installed on the narrow side and Appia Antica tiles separated by a buried gutter - which was something new in this field. Combining very different colors and models for tiles made out of concrete, brick and natural stone, with a 6x6 cm cubic stone contour, made it possible for us to match the architecture.
An impressive project as far as the surface is concerned, 5000 square meters and because it has a short deadline. We were careful with the shape of the green areas and the lake that make up this recreational, horse riding and wedding reception complex. Even though it was a challenge at the beginning, we managed to be true to the plan and timeline.
This pavement wouldn’t seem to be fit for a parking lot at first sight, because of the special color. The 400 square meters were paved with antiqued Appa Antica tiles, alternating between 40x40 cm and 20x10 cm tiles, forming a simple but impressive model through a patina color.
In order to set up the 400 square meter surface we used Bradstone Travero tiles for the garage and stairs, and Pastella tiles for the yard, which proved to be the right choice because of the warm and welcoming nuances, matching the house very well.
The complex Umbriano pavement was the ideal solution for a small, but especially elegant yard, with imposing 75x50 cm tiles combined with 75x25 cm ones, and with a metallic strip curb, set in white gravel.
A pavement with a unique concept conceived by the architect who coordinated the construction of the residential villa. It is made up of 3 types of tiles: 20 x 30 x 6 cm, 20 x 20 x 6 cm and 20 x 10 x 6 cm, white and black with a broken marble upper layer. The black and shite tones add a touch of class to any type of construction and the result satisfied even the highest standards.
Vacation houses and the apparent wood structures require a pavement from the same material, at least in areas meant for pedestrians. The solution for this construction was to use circular beech tiles, with different diameters, their nuances contrasted with the white gravel used to fill in the gaps. A warm and welcoming pavement was created, thus complimenting the house and the vacation atmosphere.
With a surface of 300 square meters and an incline the yard was set up in a rustic style, with a black background with white inserts. The pavement thus was sober and stately, giving a touch of elegance to the entire ensemble.
Pentru un pavaj longeviv și adaptat oricărui trend, dalele din graint 10 x 10 cm sunt perfecte. Ignorând costurile ridicate de montaj, trebuie să ținem cont de rezistența la intemeperii foarte crescută și modelele deosebite ce se pot realiza cu el, mai ales în combinație cu dalele din beton.
The German investor required us to pay special attention to the execution and the pavement quality. Even though the weather was not very friendly, because of the start of the cold season, we carried out the installation of 2500 square meters of pavement and the curbs for all 4 sides of the building.
Selected as a reference, this project is one of the first ones carried out by our company in Bucharest. We managed to pave 150 square meters in 13 days, approved in the first phase by our beneficiary in order to be operational. The deadline was extremely short, because it was just before the beginning of the new school year.
A large investment, with a very short deadline which required several teams and an extension of work hours. Despite of high temperatures, we managed to pave an area of 4500 square meters complete with curbs – approximately 900 meters.
The rebuilding of the parking lots for these stores was a true challenge taking into consideration the fact that the normal operation of the parking lot continued during normal work hours. We managed to take out the old pavement and install 800 square meters of new pavement within 6 days.